In this duration, residents have been sidestepping excavated portions of the 250-meter road, and faced allied problems such as repeated cuts to their electricity, gas and wifi connections, low and contaminated water supply, blocked entrances to their buildings, and vehicles getting damaged due to the lack of barricades